Every buyer runs the same arithmetic: three quotes, take the middle or the lowest. It prices a machine on signing day, and that machine will sit on a floor for five years. Only one cost line is fixed at signature. The rest accrue on site — power inside the electricity bill, water inside the water bill, consumables inside miscellaneous, downtime inside "we got through it that day". Hence the discovery in year two that running costs more than expected.
1. One Number Is Fixed, Four Are Not
The quote is page one of a five-year document. Treat it that way and the questions change: not "which is cheapest", but "which total is smallest once the machine is running".
2. Five Ledgers
| Ledger | What belongs in it | How it is usually lost |
| Purchase and depreciation | Price, freight, installation, commissioning, training, residual value — plus site works | Site works are budgeted as construction and owned by nobody: a charging point, an electrical upgrade, a water drop, a ramp |
| Power | Energy for charging and operation, priced by the local time-of-use schedule | Absorbed into a building bill that nobody reconciles against the machine |
| Water and chemistry | Clean water in, dirty water out, detergent and defoamer | Read as "water is cheap", ignoring the second pass that weak dilution causes |
| Consumables | Brushes, squeegee blades, filters, batteries, seals — priced per unit of service, not per unit of purchase | Counted as an annual lump sum instead of cost per operating hour |
| Labour and downtime | Operating hours, support hours, failure hours, rework hours | Folded into "we got through it that day" and never written down |
Site works deserve their own line. They are the most common omission in a five-year sheet because they sit in a construction budget, arrive before the machine, and are signed off by a different department than the one that will run it.
3. The Ledgers Are Coupled
That is the whole point of splitting them. Lower brush pressure saves power and buys a second pass, which spends water, chemistry and labour. A squeegee run past its life saves a blade and leaves a water film that brings rework and slip risk. Each ledger can improve while the total worsens.
A practical test: any proposal that lowers one ledger should state which other ledger pays for it. If the proposal is silent, the cost has not disappeared — it has moved somewhere that is not being measured.
4. Three Miscalculations
| Miscalculation | Why it fails | What to do instead |
| The price gap treated as savings | The gap is real, but it happens once. Efficiency, consumable life and failure rate happen every year after. | Treat the gap as an advance the next four years must earn back — and test whether they can. |
| Rated power times hours | Nameplate figure. Real draw rises under load and falls when running empty; a clogged filter cuts airflow without necessarily cutting current; charging losses grow with battery age. | Call the product a ceiling, not a bill. Measure one full cycle before committing to a number. |
| Labour converted at the minimum wage | A machine saves hours, not headcount. Fully loaded hourly cost runs well above the base rate, while the hours the machine creates — filling, draining, cleaning filters, changing brushes, moving between zones — are rarely counted. | Use consolidated hours per thousand square metres, including support and rework. |
5. The Power Ledger Is Being Repriced
Time-of-use structures in several provinces are moving, and the direction is the same: the spread between peak and valley widens, and the system operation fee stops sitting outside it.
Shaanxi has brought the system operation fee into the time-of-use float for industrial and commercial users — plus 70 per cent at peak, plus 90 per cent at critical peak, minus 70 per cent at valley — effective 1 January 2027 for a provisional year. Henan is consulting on a similar design that keeps the 1.72:1:0.45 ratio, allows a deep-valley band and caps annual valley and peak hours. That one is a draft, not in force.
Check before you calculate. Tariff documents change between draft and publication. Use the current provincial schedule for your own site, and date the assumption in your cost sheet.
Three consequences follow.
| Consequence | What it means for a buyer |
| Charging is a movable load — sometimes | It only needs a full machine at shift start, so the window can move to valley hours — provided battery capacity actually covers a shift. A machine docking twice per shift has no freedom. |
| Draw per hour decides sensitivity | A 380 V, 15 kW pressure washer draws in an hour what a scrubber draws in several, so its window moves the bill far more. |
| Charging infrastructure is capital | Points and electrical capacity belong in the same request as the machines, not in a later maintenance line. |
Night work is not automatically cheaper. Lighting, supervision and safety sit in the fifth ledger, and they are usually the reason a night shift costs more than the tariff saves.
6. Three Ways to Meter Energy
| Method | Use it for | Limitation |
| Nameplate — rated power × hours × tariff | Shortlisting | A ceiling, not a bill |
| Clamp or smart-plug over a full cycle | Verification after delivery | Misses recharging losses if only the run is metered |
| Energy per thousand square metres from a dedicated meter | A baseline for year-on-year comparison | Needs a fixed route and window to stay comparable |
Without a baseline, "we used less this year" is an opinion. With one, it is a number you can put in front of a finance committee.
7. Consumables by Condition
Price per blade means nothing without life. Divide unit price by service life, then add replacement labour — that is the number to compare.
| Part | Condition signal | What calendar replacement misses |
| Brushes | Short or collapsed tufts; stripes after a pass | Heavy-duty brushes in abrasive dust finish early |
| Squeegee | Flat lip; water stripes | A light-duty blade on rough concrete wears twice as fast |
| Filters | Falling airflow; dust carry-over | A part still inside its interval but already restricted |
| Batteries | Falling area per shift, rising returns, longer charging — all three together | Capacity tests are still needed to confirm |
8. Downtime, the Ledger Nobody Invoices
Downtime cost is roughly affected area × fallback cost per square metre × a timing factor. The factor is what people underestimate: two hours cost far more an hour before an inspection than at three in the morning.
Rework is the mild version of the same ledger. No repair ticket exists, only overtime, water and power — which is why it disappears from the accounts and stays in the labour budget forever.
Write these three into the tender, not the brochure:
A downtime log kept in the plant room, with date, duration, cause and area affected
A rework log with the same fields, so the mild version is captured too
A stated timing factor per zone — when a stop hurts most, agreed before the first failure
9. Tender Weighting Is Moving
In a published CNY 33.38 million equipment renewal, the winning bid was the highest of three and still scored first: price carried 30 points, of which it earned 24.8, while technical parameters and after-sales scored full marks. A three-year service contract in the same programme was weighted 60 technical, 30 commercial, 10 price. Neither rewarded the lowest number.
Three moves follow.
Require a five-year cost sheet with stated assumptions — and score the assumptions. A sheet built on nameplate power and minimum wage is a wish, not a forecast.
Write energy and consumables as verifiable post-commissioning commitments. Measured at three months, against the baseline, with a named person responsible for the reading.
Define the boundary between routine maintenance and professional repair. It is a recurring dispute: one recent complaint argued the tender lacked exactly that boundary and was rejected on procedure, not merit.
10. A Sheet and Three Checks
Five rows, five columns, one page. Where a cell cannot be filled, write "to be measured" — never a plausible guess, because a guess becomes the budget.
At handover, three checks:
Measure one full cycle — charge, run, discharge — with a clamp or plug meter
Build an energy and consumable baseline after three months, on a fixed route and window
Hang a downtime and rework log in the plant room, and review it monthly
Need the ledger figures for your own site?
Our team can help you build a five-year cost sheet from your meter readings, floor area and shift pattern — online support and a global spare-parts supply chain, no on-site promise attached.
Frequently Asked Questions
Does a 30 per cent lower price always cost more overall? Not always, but the gap must be earned back. Efficiency, consumable life and failure rate each move the total, and they move it every year after the first.
Can I multiply rated power by hours? Only as a ceiling. Measure a full cycle first — real draw changes with load, filter condition and battery age.
Do time-of-use tariffs matter for a scrubber? Only if charging can move. A machine docking twice per shift has no window, and the tariff then changes the bill without changing the behaviour.
Which equipment is most tariff-sensitive? High-draw units such as a 380 V, 15 kW pressure washer, which can draw in one hour what a scrubber draws across several.
How do I express labour savings? Consolidated hours per thousand square metres, including support and rework hours the machine creates.
Should consumables be replaced on a calendar? On condition, backed by records. Calendar replacement cannot tell you which part is already finished.
Does diluting detergent save money? It lowers chemistry cost and often raises water, power and labour, because weak dilution buys a second pass.
How do I estimate downtime? Affected area × fallback cost per square metre × a timing factor — and the factor has to come from a log, not a feeling.
How do I stop optimistic cost sheets? Score the assumptions, not just the total, and make energy and consumables verifiable after commissioning.
What is most often omitted from a five-year sheet? Site works — charging point, electrical upgrade, water drop, ramp. They sit in a construction budget and go unowned.